Borealis InsightMarket report · Edition 04
Nordic data center
market report 2026
Capacity, demand, power and prices across Norway, Sweden, Finland and Denmark.
Full year 2026 · Published February 2027
Data to 31 December 2026
- This is our 2026 report on the Nordic data center market.
- It covers the full year, with data up to the end of December.
Borealis InsightContents
Five chapters, from market size to outlook
01
Market size and growth
p. 04
02
Capacity and pipeline
p. 09
03
Power, prices and sustainability
p. 15
04
Country profiles
p. 22
05
Outlook for 2027
p. 30
Each chapter opens with its three key numbers.
- Five chapters, and the one most readers ask about is chapter three, on power and prices.
Borealis InsightChapter 02
02
Chapter two
Capacity and the pipeline behind it
Where the 2.4 GW of live capacity sits, and what comes online by 2028.
- Chapter two looks at capacity, and at the pipeline behind it.
Borealis InsightKey finding
Demand absorbed 94% of new capacity before the buildings were finished.
Operators now sign customers during construction, so new supply rarely reaches the open market.
94%of 2026 capacity pre-let before completion
3yearsin a row that demand outran new supply
- The key finding: ninety-four percent of new capacity was taken before it was finished.
- That is the third year in a row demand has run ahead of supply.
Borealis InsightKey figures 2026
2026 in five numbers
Market size
€8.6B
+19% on 2025, the fastest growth since our first edition.
96%
Renewable power share
71%
Capacity let to hyperscalers
2.4 GWLive IT capacity across four countries
1.18Average power usage effectiveness
- The market reached eight point six billion euros, up nineteen percent.
- And ninety-six percent of the power behind it was renewable.
Borealis InsightMarket size and growth
The market grew in volume, not only in price
8006004002000
107.552.50
202120222023202420252026
New capacity, MW (left)Market size, € billion (right)
+34%New capacity added vs 2025
+3%Average price per kW per month
- Operators added four hundred and fifty-five megawatts in 2026, a third more than the year before.
- Prices rose only three percent, so the growth is volume, not price.
Borealis InsightThe year in quarters
Four quarters that set the pace
Jan to Mar
Apr to Jun
Jul to Sep
Oct to Dec
Q1Stavanger campus breaks ground
First phase of 120 MW, fully pre-let.
Q2Grid fees cut for large loads
Swedish tariff change lowers power costs 6%.
Q3Record quarter for leasing
140 MW signed by cloud providers.
Q4Heat reuse goes mainstream
Three Helsinki sites now feed district heating.
- The third quarter was the turning point, with one hundred and forty megawatts signed in three months.
Borealis Insight2026 vs 2025
A tighter market than a year ago
Metric20252026
Market size€7.2B€8.6B+19%
Live capacity2.0 GW2.4 GW+20%
Capacity added in the year340 MW455 MW+34%
Average price per kW per month€128€132+3%
Vacancy rate6.1%4.3%−1.8 pts
Renewable power share93%96%+3 pts
- Vacancy fell to four point three percent, so finding space is harder than a year ago.
Stavanger cluster · 3 campuses
Cluster spotlight
Stavanger, the fastest-filling cluster
Hydropower, cold sea water and two new subsea cables made the west coast the first choice for 2026 leases.
- Live capacity310 MW
- Under construction240 MW
- Pre-let share of new space97%
- Average PUE1.12
- Stavanger filled faster than any other Nordic cluster this year.
- Ninety-seven percent of its new space was let before it opened.
Borealis InsightContributors
The research team behind this edition
Ingrid Solheim
Managing Director
Twelve years in Nordic infrastructure research.
Mikko Laine
Head of Research
Built the capacity model behind every chart.
Sara Lindgren
Lead Analyst, Power
Tracks grid fees and power contracts.
Jonas Holm
Data Engineer
Collects site data from 140 operators.
- Mikko Laine led the research and built the capacity model behind every chart.
Executive comment
Power, not land or fibre, now decides where the next campus is built.
Ingrid Solheim · Managing Director, Borealis Insight
- Our managing director sums it up: power now decides where the next campus is built.
Borealis InsightConclusions
Conclusions and what we watch in 2027
What 2026 showed
- Supply is the constraint, not demand.
- Power access sets the map of new sites.
- Prices stay flat while volumes climb.
Next steps
- 01Quarterly vacancy tracker from March
- 02New chapter on heat reuse economics
- 03Next full edition in August 2027
research@borealis-insight.example · borealis-insight.example/nordic-2026
- The main conclusion: supply, not demand, limits this market.
- Next, we add a chapter on the economics of heat reuse.