Borealis InsightMarket report · Edition 04

Nordic data center
market report 2026

Capacity, demand, power and prices across Norway, Sweden, Finland and Denmark.

Full year 2026 · Published February 2027
Data to 31 December 2026
Borealis InsightContents

Five chapters, from market size to outlook

01

Market size and growth

p. 04
02

Capacity and pipeline

p. 09
03

Power, prices and sustainability

p. 15
04

Country profiles

p. 22
05

Outlook for 2027

p. 30

Each chapter opens with its three key numbers.

Borealis InsightChapter 02
02

Chapter two

Capacity and the pipeline behind it

Where the 2.4 GW of live capacity sits, and what comes online by 2028.

Borealis InsightKey finding

Demand absorbed 94% of new capacity before the buildings were finished.

Operators now sign customers during construction, so new supply rarely reaches the open market.

94%

of 2026 capacity pre-let before completion

3years

in a row that demand outran new supply

Borealis InsightKey figures 2026

2026 in five numbers

Market size

€8.6B

+19% on 2025, the fastest growth since our first edition.

96%

Renewable power share

71%

Capacity let to hyperscalers

2.4 GW

Live IT capacity across four countries

1.18

Average power usage effectiveness

Borealis InsightMarket size and growth

The market grew in volume, not only in price

8006004002000 107.552.50 202120222023202420252026
New capacity, MW (left)Market size, € billion (right)
180
210
260
300
340
455
3.9 4.5 5.4 6.3 7.2 8.6
+34%

New capacity added vs 2025

+19%

Market size vs 2025

+3%

Average price per kW per month

Borealis InsightThe year in quarters

Four quarters that set the pace

Jan to Mar Apr to Jun Jul to Sep Oct to Dec
Q1

Stavanger campus breaks ground

First phase of 120 MW, fully pre-let.

Q2

Grid fees cut for large loads

Swedish tariff change lowers power costs 6%.

Q3

Record quarter for leasing

140 MW signed by cloud providers.

Q4

Heat reuse goes mainstream

Three Helsinki sites now feed district heating.

Borealis Insight2026 vs 2025

A tighter market than a year ago

Metric20252026
Market size€7.2B€8.6B+19%
Live capacity2.0 GW2.4 GW+20%
Capacity added in the year340 MW455 MW+34%
Average price per kW per month€128€132+3%
Vacancy rate6.1%4.3%−1.8 pts
Renewable power share93%96%+3 pts
Stavanger cluster · 3 campuses

Cluster spotlight

Stavanger, the fastest-filling cluster

Hydropower, cold sea water and two new subsea cables made the west coast the first choice for 2026 leases.

  • Live capacity310 MW
  • Under construction240 MW
  • Pre-let share of new space97%
  • Average PUE1.12
Borealis InsightContributors

The research team behind this edition

Ingrid Solheim

Managing Director

Twelve years in Nordic infrastructure research.

Mikko Laine

Head of Research

Built the capacity model behind every chart.

Sara Lindgren

Lead Analyst, Power

Tracks grid fees and power contracts.

Jonas Holm

Data Engineer

Collects site data from 140 operators.

Executive comment

Power, not land or fibre, now decides where the next campus is built.
Ingrid Solheim · Managing Director, Borealis Insight
Borealis InsightConclusions

Conclusions and what we watch in 2027

What 2026 showed

  • Supply is the constraint, not demand.
  • Power access sets the map of new sites.
  • Prices stay flat while volumes climb.

research@borealis-insight.example · borealis-insight.example/nordic-2026